26-12-2011, 08:24
(Questo messaggio è stato modificato l'ultima volta il: 26-12-2011, 08:29 da tiger86.)
Ecco l'estratto:

Hiking lines: The hiking lines may be tied between pulpit and its aft mounting
point such that when pushing down hard on the hinking lines at the mid point
between the two centre stanchions, no part of the hinking line including padding
etc. shall touch the deck. The hiking lines may be terminated by rope, as long as
the distance bridged by the rope doesn’t exceed 400 mm in length, and the rope
construction has the equivalent strength of 3 mm steel wire. On each side a
padeye may be mounted on deck near the gunwale for pulling down the hiking
lines: It shall be positioned at the midpoint between the aft stanchion and the
pushpit +/- 50 mm. The hiking lines shall be attached to the pushpit, being
optionally led through the pad eye on deck or shall be terminated at the padeye.
The aft stanchion and pushpit may be reinforced.

Hiking lines: The hiking lines may be tied between pulpit and its aft mounting
point such that when pushing down hard on the hinking lines at the mid point
between the two centre stanchions, no part of the hinking line including padding
etc. shall touch the deck. The hiking lines may be terminated by rope, as long as
the distance bridged by the rope doesn’t exceed 400 mm in length, and the rope
construction has the equivalent strength of 3 mm steel wire. On each side a
padeye may be mounted on deck near the gunwale for pulling down the hiking
lines: It shall be positioned at the midpoint between the aft stanchion and the
pushpit +/- 50 mm. The hiking lines shall be attached to the pushpit, being
optionally led through the pad eye on deck or shall be terminated at the padeye.
The aft stanchion and pushpit may be reinforced.
Tra me e il mare comanda il tempo...
Leandro
Leandro
